MIL-DTL-9419G
TABLE II. Group A inspection.
Requirement
Test method
Sampling plan
Inspection
paragraph
paragraph
Subgroup 1
Visual and mechanical examination 1/
See 4.6.1.1.1.1
Subgroup 2
Actuating force
Actuating lever travel
See 4.6.1.1.1.2
Dielectric withstanding voltage
Switching resistance
1/ At the option of the contractor, documented in-process inspection may be used to satisfy the
contractor's in-process control data on these tests are made available to the Government upon
request.
TABLE III. Zero defect sampling plan.
Number of switches
to be tested
Lot size
Subgroup 1
Subgroup 2
1-
15
5
All
16 -
50
5
13
51 -
90
7
13
91 -
150
11
13
151 -
280
13
20
281 -
500
16
29
501 - 1,200
19
34
1,201 - 3,200
23
42
3,201 - 10,000
29
50
10,001 - 35,000
35
60
4.6.2 Group C inspection. Group C inspection shall consist of the tests specified in table I in the order
shown and shall be made on sample units produced with production tools and processes.
4.6.2.1 Disposition of sample units. Sample units which have been subjected to group C inspection
shall not be delivered on a contract or order.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business