MIL-PRF-22885/18K
QUALIFICATION:
Qualification inspection: All applicants for qualification approval shall demonstrate that each of their
items conforms to all the requirements specified in the applicable documents, singularly and in
combination with all other previously qualified items, regardless of manufacturer (see table IV).
Group A inspection.
Seal test. Visual examination only.
TABLE IV. Qualification inspection (group submission).
Sample units
Qualification table of MIL-PRF-22885
Extent of approval
Assembly of
All tests
2/
M22885/18-02 and
M22885/99-K108 1/
Assembly of
Groups I and II
M22885/18-153 and
M22885/99-K208
Assembly of
All
M22885/18-07and
M22885/99-K208
Visual and mechanical examination
(2 sample units)
Operating characteristics
Contact resistance
Assembly of
M22885/18-08 and
M22885/99-K208
(2 sample units)
1/ For group VIII tests, two samples each of M22885/99-K201 through M22885/99-K215 pushbutton
lens shall be assembled to M22885/18-07 switch housing.
2/ Seal test to be performed in group II and group VII only. 115 V ac electrical endurance tests are to
be performed at 60 Hz only.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business