MIL-DTL-9395/39D
TABLE V. Extent of qualification.
Number of samples
PIN
Tests
Qualifies
required
Electrical chambers either hermetically sealed or unsealed
M9395/39-GAJAG
2 ea. resistive
Complete in accordance with
-AAJAG
2 ea. intermediate
qualification inspection of
All
current
MIL-DTL-9395
-A6R3W
2 ea. low level
-G6R3W
2 ea. resistive
Electrical chambers unsealed
M9395/39-KAJAG
2 ea. resistive
Complete in accordance with
Configuration codes
-DAJAG
2 ea. current
qualification inspection of
D, E, F, K, L, and M
-D6R3W
2 ea. low level
MIL-DTL-9395
-K6R3W
2 ea. resistive
The margins of this specification are marked with vertical lines to indicate where modifications were
made. This was done as a convenience only and the Government assumes no liability whatsoever for
any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements
of this document based on the entire content irrespective of the marginal notations.
Referenced documents:
MIL-DTL-9395
MIL-PRF-5606
MIL-DTL-5624
MIL-PRF-7808
MIL-DTL-38999
MIL-PRF-83282
MIL-STD-202
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - EC
Air Force - 85
(Project 5930-2008-046)
DLA CC
NOTE: The activities listed above were interested in this document as of the date of this document.
Since organizations and responsibilities can change, you should verify the currency of the information
above using the ASSIST Online database at https://assist.daps.dla.mil/ .
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business