MIL-PRF-8805/68L
Group A Inspection:
M8805/68-022 through 028: In accordance with MIL-PRF-8805.
M8805/68-029 through 035: Each switch shall be screened in accordance with the requirements
of table III in the order listed, except that the seal testing may be performed out of the specified
sequence. In addition, a sample of three switches shall be taken from the screened lot and tested
in accordance with table IV in the order listed.
Table I I I . Screening requirements for high reliability parts.
100 percent inspection
Radiographic inspection
Run-in
Dielectric withstanding voltage
Insulation resistance
Contact resistance
Seal
Table IV Quality conformance inspection for high reliability parts.
3 samples from each screened lot
Random vibration
Radiographic inspection
Dielectric withstanding voltage
Insulation resistance
Contact resistance
Seal
Part or identifying number (PIN). See table V.
Substitution information: See table VI.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business