MIL-PRF-22885/110C
Qualification:
Group inspection: See table VI.
Group A inspection: For seal testing, only external examination of the seal is required.
TABLE VI. Qualification inspection - group submission.
MIL-PRF-22885 qualification inspection table
Extent of
PIN
qualifi-
Group
Quantity to be tested
cation
I
All samples
All samples
2
M22885/110AB1W
II 1/
2
M22885/110BB1W
M22885/110AB1W
1
III
1
M22885/110BB1W
IV
2
M22885/110AB1W
All PINs
V
2
M22885/110AB1W
VI
8 2/
M22885/110AB1W
VII 3/
4
M22885/110AB1W
M22885/110CC1X
9 (1 each color)
VIII 4/ 5/
9 (1 each color)
M22885/110CD4XXX
1/ During tests requiring switches to be mounted, one-half of the sample units
shall be mounted with the mounting spacer in front of panel. The remaining
half shall be mounted with the mounting spacer discarded or behind panel,
as necessary.
2/ Four samples for resistive load and four samples for inductive load testing.
3/ Two samples for low level life and two additional samples for logic level
endurance. The low level endurance test shall be substituted for mechanical
endurance in the group VII test sequence. (mechanical endurance testing is
not required).
4/ NVIS color and NVIS radiance measurements shall be taken where
applicable during the illuminated color portion of the test sequence.
5/ Includes one sample each of NVIS green A, NVIS green B, NVIS yellow,
and NVIS red.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business