MIL-S-8805/50D
Qualification:
Group submission: See table II.
Conformance:
Group B inspection: Not applicable.
Part or Identifying Number (PIN): See table III.
TABLE II. Qualification inspection - group submission. 1/
Examination or test |
Basic switch |
Other switch samples |
Extent of approval |
Qualification inspection table of MIL-PRF-8805, groups I, II, III, V, VI, VII, and VIII |
MS25040-1 |
MS25040-2, and -4: Two sample units each, visual and mechanical examination |
ALL |
TABLE III. Part or Identifying Number (PIN). 1/
PIN |
Contact arrangement |
MS25040-1 MS25040-2 MS25040-3 MS25040-4 |
2 circuit SPDT 4 circuit DPDT |
1/ Military Standard Drawing MS25040 is canceled and superceded by MIL-S-8805/50.
Referenced documents. In addition to MIL-PRF-8805, this document references the following:
MIL-STD-202
AN3054
Marginal notations are not used in this revision to identify changes with respect to the previous issue due to the extent of the changes.
Custodians: Preparing activity: Army - CR DLA - CC
Navy - EC
Air Force - 11 (Project 5930-2006-020) DLA - CC
Review activities: Army - AR, GL, MI
Navy - AS, MC, OS, SH Air Force - 19, 99
NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at https://assist.daps.dla.mil/
4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business