MIL-S-22885/100A
QUALIFICATION:
All applicants for qualification approval shall demonstrate that each of their items conform to all the requirements in the applicable documents, singularly and in combination with all the other previously qualified items, regardless of manufacturer.
Group submission: See table X.
TABLE X. Qualification inspection - group submission.
Switch |
Qualification Table X of MIL-PRF-22885 |
Extent of Approval |
|
Group |
Number of Switches |
||
M22885/100-068BW1W |
I II III VI VII |
10 4 (From Group I) 2 (From Group I) 2 (From Group I) 1/ 2 (From Group I) 2/ |
1 & 2 7/ (Unsealed Dripproof) |
M22885/100-123BW1W |
I II VI |
6 4 (From Group I) 2 (From Group I) 3/ |
1 & 2 7/ (Unsealed Dripproof) |
M22885/100-010BN1(X) M22885/100-010BW1(X) M22885/100-010BS1(X) M22885/100-010BC1(X) |
VIII 6/ |
10 (2 of each color) 10 (2 of each color) 10 (2 of each color) 5/ 10 (2 of each color) |
All |
M22885/100-123BW1W |
I 4/ |
2 2 |
All |
1/ Test sea level inductive DC load only.
2/ Intermediate current test not applicable.
3/ Test sea level resistive DC load only.
4/ These switches shall be tested for RFI shielding.
5/ Sunlight readable test legend: Remote, Alt Low.
6/ 2 switch bodies only to be used for color and luminance testing.
7/ Enclosure design.
Group A Inspection: Shall be in accordance with Table XI.
TABLE XI. Group A inspection.
Examination or Test |
Requirement and Inspection Reference |
Visual and mechanical examination |
MIL-PRF-22885 |
Operating characteristics |
MIL-PRF-22885 |
Dielectric withstanding voltage |
MIL-PRF-22885 |
Contact resistance |
MIL-PRF-22885 |
Custodians: Preparing activity: Air Force - 11 DLA - CC
DLA - CC
(Project 5930-1763-03)
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business