MIL-DTL-5423/3D
REQUIREMENTS:
Dimensions and configuration: See figure 1.
Silicon rubber: Grade 50.
Restoring force: Not applicable.
Operation of guards: Applicable.
Sand and dust: Boots shall be mounted on the applicable switch before the switch is installed on the test
enclosure.
Salt spray (corrosion): Not applicable.
Part or Identifying Number (PIN): M5423/03-01.
Qualification: First Article Testing in accordance with MIL-DTL-5423.
The margins of this specification are marked with vertical lines to indicate where modifications were made. This was
done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these
notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire
content irrespective of the marginal notations.
Referenced documents:
MIL-DTL-5423
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - AS
Air Force - 85
(Project 5930-2008-060)
DLA - CC
NOTE: The activities listed above were interested in this document as of the date of this document. Since
organizations and responsibilities can change, you should verify the currency of the information above using the
ASSIST Online database at www.assist.daps.dla.mil.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business