A-A-50625(SH)
2. Regulatory Requirements. The offeror/contractor is encouraged to use recovered materials in accordance with Public Law 94-580 to the maximum extent practical.
3. Preservation, packaging, packing, labeling and marking. The preservation, packaging, packing, labeling and marking shall be as specified.
NOTES
1. Acquisitions requirements. Acquisitions documents must specify the following
(a) Range
(b) Accuracy
(c) Fluid
(d) Pressure
(e) Temperature
(f) Flow rate
(g) Fluid viscosity
(h) Pressure drop
(i) Shock and vibration
(j) Type of sensor
(1) Rotameter
(2) Flow switch
(3) Flowmeter
(4) Vortex shedding
(k) Preservation, packaging, packing, labeling and marking
2. NEMA is available from the National Electrical Manufactures Association, 2101 L Street, N.W., Suite 300, Washington, DC 20037-1580
3. Unless otherwise indicated federal and military specifications, standards, and handbooks are available from the Standardization Documents Order Desk, Bldg 4D, 700 Robbins Avenue, Philadelphia, PA 19111-5094
Preparing activity
Navy – SH
(Project 5930-N749)
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business